
1.Technical Parameters
item | unit | Q376 | Q376B | Q378c | Q3710 | Q3720 | Q3730 | Q3750 | Q37100 |
Maximum weight of cleaning | Kg | 500 | 600 | 800 | 1000 | 2000 | 3000 | 5000 | 10000 |
Abrasive flow rate | Kg/min | 2*200 | 2*200 | 2*250 | 2*250 | 3*250 | 3*250 | 4*250 | 4*250 |
Ventilation capacity | m3/h | 5000 | 5000 | 5000 | 5000 | 9000 | 11000 | 1400 | 16000 |
Lifting amount of elevating conveyor | T/H | 24 | 24 | 30 | 30 | 45 | 45 | 60 | 75 |
Separating amount of separator | T/H | 24 | 24 | 30 | 30 | 45 | 45 | 60 | 75 |
3.Trade Information:
MOQ: 1set.
Settlement Currency: USD, RMB, EUR.
Trade mode: FOB, CIP, CFR, CIF, DDU, DDP.
Payment term: 30% deposit by T/T, the balance paid before delivery
by T/T, or L/C at sight.
Delivery time: Within 5-15 days according to different type
machine.
Blast wheel of shot blasting machine
Is the key of the airless shot cleaning equipment,it's logevity,
low noise emission etc, enjoy the fame on the market of the world.
In the recent years, curve-blade blast wheel which on top of the
international
technology had employed us,and direct-driven blast wheels is the
largest power in china.
Direct-driven blast wheel of shot blasting machine
Direct-driven blast wheel is one kind of new-design,high efficient
blast wheel, beautiful apprearance, compact comfi-guration, low
noise, economy and environmental protection, has the largest power
and largest rate abrasive flow.
Belt-wheel blast wheel of shot blasting machine
Belt-wheel blast wheel is conventional,large rate abrasive flow and
good cleaning effect.It is need part of the airless shot blast
cleaning equipment.
Curve-blade blast wheel of shot blasting machine
Curve-blade blast wheel is the most advanced high efficiency on the
world at the moment, huge blast speed and area, high-efficiency,
uniformclean etc.
After-sale service of shot blasting machine:
1. Installation and commissioning issue: We will send one
technician to assist with machine installation and commissioning,
customer pays for their tickets, hotel and diet.
2. Warranty time:12 months from date of commissioning completion,
but no more than 18 months from date of delivery.
3. Supply full english documents: including general installation
drawings, pit design drawings, manual book, electric wiring
diagram, electric manual book and maintenance book, etc.
Welcome to visit our factory!