
S50C/P20/1.2311 injection plactic mold base
Mould making steps:
1. Samples/Drawing &Requirement from you
2. Mould design:we will Communicate and Exchange the opinion with
you after you place order.
3. Material Purchase:Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould : following and controlling the tooling
processing.
6. Mould testing:We will inform you the date.
Than will send the sample's inspection report&injection
parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.
TOLERANCES FOR STANDARD MOULD PLATES
Top Clamping Plate(Side Gate System) | AB Plate | Stripper Plate (Side Gate System) | Support Plate | Bottom Clamping Plate(Pin point Gate System) | Top Clamping Plate(Pin point Gate System) | Stripper Plate (Pin point Gate System) | Stripper Plate | Ejector Retainer Plate & Ejector Plate | Spacer Block | |
Thickness | +0.5~0 | +0.4~+0.1 | ||||||||
Width | +0~-0.2 | +1.0~0 | +0.5~0 | -1.5~+0.5 | ||||||
Length | +0~-0.2 | +1.0~0 | +0~0.2 | |||||||
Perpendicularity | 0.05/300 | Datum corners:0.01/100 | 0.05/300 | Datum corners:0.01/100 | 0.05/300 | 0.1/300 | ||||
Datum corners:0.05/300 | Datum corners:0.05/300 | |||||||||
Parallelism | 0.01/100 | |||||||||
Chamfer(Plate width: 150-270mm) | C1.5~C2.0 | |||||||||
Chamfer(Plate width≥300mm) | C2.0~C3.0 |
Q. How long is the lead time for mold?
A : It depends on the mold’s size and complexity. Normally, the lead time is 25-35 days. If the molds are very simple and not in big size, we can work out with 15 days.
Q. Before shipment, how to make sure the products quality?
A : We are specialized in high quality products. We have QC to inspect the products before each shipment. You can come to visit our factory or ask a third party for inspection. Or we can send you videos to show the production process.
Q. How could I pay them?
A : T/T, L/C are acceptable.
Q. Can I get discounts?
A : Yes, for big order, old customer and frequent customers, we give reasonable discounts.
Q. Which Shipment way is available?
A : By sea to your nearest port.
By air to your nearest airport.
By express (DHL, UPS, FEDEX, TNT, EMS) to your door.
Guangzhou Changfeng Steel Co., LTD
Guangzhou ChangFeng Steel Co., Ltd. is a professional special steel company, which specialized in exporting mould steel products based in China.With twenty years experience in special steel industry, our main products are Plastic Mould Steel, Hot Work Mould Steel, Cold Work Mould Steel, Alloy Structural Steel, Tool Steel, Stainless Steel, Carbon Steel and Forged Block.
To ensure provide high quality products to customers, we have close cooperation with many Chinese first class special steel enterprises, including Baosteel Group, Dongbei Special Steel, Changcheng Special Steel, Hongsheng Heavy Industry, Xingcheng Special Steel, Daye Special Steel. We have thousand tons of stock materials in our own factory and also can provide processing services to customers. We are full of export experience for many years, the product covers America, Germany, France, Italy, Turkey, Singapore, Thailand, Malaysia, Vietnam, Taiwan, and Middle-East.
After years of development, the company has established a complete quality management and export service system. We have a group of experienced and competent elites and is capable of offering the best service to clients. Our company equips with large-sized Vertical saw machines, Horizontal saw machines, Milling machines, Grinding machines and other advanced equipments to provide customers with cutting and other processing services. All the products should be inspected the metallographic analysis, hardness, ultrasonic flaw detection and other strict inspection processes, which meet the standards of DIN, AISI, JIS and GB to ensure their function and quality.
Our company keeps the principle of “sincerely cooperation, endless striving for perfection”. We desire to establish the long-term mutual beneficial and win-win relationship with clients all over the world.